Incidents

A breach workflow with a clock — not a Slack channel.

Detection, triage and notification under §8(6). A 72-hour clock, a Board notification template and a data-principal notification with evidence.

For CISOs, DPOs and incident response leads accountable when the clock starts.

01
Business risk

A breach mishandled is worse than the breach itself.

Missed notification windows, unclear scope and inconsistent communications turn a technical incident into a public failure and a regulatory finding.

DPDP §8(6) requires the Data Fiduciary to intimate the Board and each affected data principal of a personal data breach in the form and manner prescribed.
02
Operational challenge

Response cannot be improvised at 2am.

The clock starts on detection. The Board template must be ready. The data-principal notification must be ready. The scope must cite real inventory records.

  • 72-hour clock on detection with escalation.
  • Scope cites systems, applications and vendors from the inventory.
  • Board notification template pre-approved by legal.
  • Data-principal notification per affected cohort.
  • Remediation tasks with named owners and closure evidence.
03
Binary AIQ workflow

Detect, triage, notify, remediate, close.

One workflow across incident types, with the clock and templates pre-agreed.

  1. 01
    Detect
    Incident opened; clock starts; scope drafted against the inventory.
  2. 02
    Triage
    Severity assigned; legal, DPO and IR lead notified.
  3. 03
    Notify Board
    Board notification issued under §8(6) with template pack.
  4. 04
    Notify Principals
    Data-principal notification per affected cohort with contact evidence.
  5. 05
    Remediate
    Tasks assigned to owners with closure evidence.
  6. 06
    Close
    Post-incident report with lessons and control changes.
04
Proof / evidence

A file the Board can review and the regulator can request.

Every step timestamped. Every notification with evidence. Every remediation task with closure.

Artifacts generated
  • Incident timeline with clock
  • Scope report citing inventory records
  • Board notification (§8(6))
  • Data-principal notification per cohort
  • Remediation register with closure evidence
  • Post-incident review report
05
Outcome

The programme's worst day, handled to plan.

No improvisation. No missed windows. The response is the plan you rehearsed.

Grounded in
DPDP §8(6)
Clock
72 hours
Templates
Board · Principal