Data-Principal Rights

From intake to response letter — one workflow, one clock.

Grievance intake, identity verification, cross-system fulfilment and a response letter that cites what was done and why.

For the grievance officer and privacy operations team responsible for the response under §13.

01
Business risk

A missed DSR is a regulator's first exhibit.

Under DPDP, the grievance officer is a named accountability. A missed clock, a partial response or an unverified requester each surface the programme's operational weakness.

DPDP §§11–14 grants access, correction, erasure and grievance rights — with the Data Fiduciary required to respond in the time prescribed by rule.
02
Operational challenge

DSRs cross every team and every system.

A single request may touch CRM, product, support, marketing and vendors. The identity of the requester must be verified. The response must cite what was done — not just that it was done.

  • Grievance intake per legal entity with named grievance officer.
  • Identity verification with attempt log.
  • Task fan-out across systems from the enterprise inventory.
  • Response letter generated with lineage — what was returned, corrected, erased.
  • SLA clock per request with escalation paths.
03
Binary AIQ workflow

One intake. One clock. One response.

Every request runs the same lifecycle. No off-platform email chains.

  1. 01
    Intake
    Public form per legal entity captures request type and identity claims.
  2. 02
    Verify
    Identity check against the record — attempts logged.
  3. 03
    Scope
    Fan-out tasks to systems and vendors that hold the requester's data.
  4. 04
    Fulfil
    Named owner per task returns, corrects or erases with evidence.
  5. 05
    Respond
    Response letter generated citing what was done per system.
  6. 06
    Close
    Closure record with SLA compliance and audit trail.
04
Proof / evidence

A closed request with lineage.

The response letter references specific systems and specific actions — not a paragraph of assurance.

Artifacts generated
  • Intake form per legal entity
  • Identity verification attempt log
  • Per-system fulfilment task with owner and evidence
  • Response letter with system-level lineage
  • SLA report per request type
  • Grievance officer register
05
Outcome

Rights honoured on time, with a record.

The response is not a paragraph — it is a lineage. The regulator sees what was done, where, by whom.

Grounded in
DPDP §§11–14
SLA
Per request type
Response
System-level lineage